Construction projects frequently reach a point where the estimated cost is higher than the available budget.
The immediate reaction may be to reduce scope, select cheaper materials, or postpone certain project components. These measures may lower the initial cost, but they do not necessarily improve project value.
Value engineering in construction takes a different approach.
Instead of asking, “What can we remove to make the project cheaper?”, value engineering asks:
“Is there a better way to achieve the required function?”
That distinction matters.
A successful value engineering exercise may reduce capital cost, simplify construction, shorten the schedule, improve maintainability, reduce lifecycle costs, or eliminate unnecessary complexity. However, those benefits should not come at the expense of required performance, safety, reliability, or project objectives.
For complex infrastructure, energy, mining, and industrial projects, value engineering is therefore best understood as a structured engineering decision-making process rather than a cost-cutting exercise.
What Is Value Engineering in Construction?
Value engineering in construction is a structured process used to improve project value by examining the functions that a facility, system, or component must perform and evaluating alternative ways to deliver those functions.
The goal is to achieve the required performance using resources more effectively.
SAVE International describes the Value Methodology as a systematic, multidisciplinary process based on function analysis that seeks an optimum balance between function, performance, quality, safety, and cost.
A useful way to think about value is:
Value = Required Function and Performance ÷ Resources Required
The resources involved are not limited to the purchase price.
They may include:
- Capital cost
- Engineering effort
- Construction labour
- Schedule
- Materials
- Energy
- Maintenance
- Replacement costs
- Operating resources
- Project risk
This is why the lowest-cost option is not automatically the highest-value option.
A slightly more expensive system may provide better value if it reduces maintenance, avoids downtime, lasts longer, or simplifies construction.
Value Engineering vs. Cost Cutting
One of the most common misunderstandings in construction is treating value engineering as another term for reducing cost.
The two approaches are fundamentally different.
| Value Engineering | Cost Cutting |
|---|---|
| Protects the required function | May reduce or remove function |
| Evaluates technical alternatives | Often focuses primarily on price |
| Considers performance and reliability | May prioritize immediate savings |
| Considers lifecycle cost | Often focuses on initial capital cost |
| Evaluates impacts across disciplines | May evaluate items independently |
| Considers constructability and schedule | May overlook downstream impacts |
| Makes trade-offs visible | Can create hidden future costs |
| Seeks better overall value | Seeks lower immediate expenditure |
For example, changing a specified pump to a less expensive model may reduce procurement cost.
But if the alternative consumes more energy, requires more maintenance, has a shorter expected service life, or cannot reliably achieve the required operating point, the project has not necessarily gained value.
It has simply spent less money initially.
A cheaper solution is not automatically a higher-value solution.
Why Value Engineering Matters in Construction Projects
Value engineering is particularly useful on projects where cost, technical requirements, constructability, operations, and schedule are tightly connected.
Controlling Capital Cost
A project can accumulate cost through conservative assumptions, unnecessary complexity, oversized systems, difficult construction details, excessive customization, or design decisions that were never revisited as better information became available.
Value engineering can identify where resources are being consumed without creating proportional project value.
Opportunities might include:
- Optimizing structural quantities
- Simplifying layouts
- Reducing unnecessary excavation
- Standardizing equipment
- Revising utility routing
- Selecting alternative materials
- Reducing unnecessary custom fabrication
- Improving construction sequencing
The objective is not to remove necessary scope. It is to challenge whether the current solution is the most efficient way to deliver it.
Improving Constructability
A technically correct design can still be difficult or expensive to build.
Constructability considerations may reveal opportunities such as:
- Easier equipment access
- Reduced temporary works
- Simpler structural connections
- More practical excavation limits
- Improved lifting access
- Reduced field welding
- Prefabrication
- Modularization
- Fewer construction interfaces
An alternative that uses similar quantities but is significantly easier to construct can still create substantial project value.
Reducing Lifecycle Cost
Initial construction cost is only one part of an asset’s total cost.
Depending on the project, long-term expenditures may include:
- Energy consumption
- Inspection
- Preventive maintenance
- Spare parts
- Equipment replacement
- Shutdowns
- Labour
- Cleaning
- Repairs
- Decommissioning
A value engineering review should therefore ask not only:
“What does this option cost to build?”
but also:
“What will it cost to own and operate?”
Reducing Schedule Risk
Some alternatives create value primarily by making the project easier or faster to execute.
Examples may include:
- Replacing long-lead equipment with an acceptable alternative
- Standardizing components
- Increasing off-site fabrication
- Simplifying installation
- Reducing concrete curing dependencies
- Changing construction sequencing
- Reducing utility relocations
On schedule-sensitive projects, avoiding a critical-path delay can sometimes create more value than a direct reduction in material cost.
Improving Long-Term Performance
Value engineering should protect the performance that matters to the owner.
Depending on the asset, that could include:
- Capacity
- Reliability
- Structural performance
- Availability
- Energy efficiency
- Maintainability
- Durability
- Operating flexibility
- Future expansion capability
A proposal that lowers cost but significantly reduces one of these required outcomes may represent a trade-off, but it should not automatically be presented as a value improvement.
What Should Be Evaluated During Value Engineering?
A good VE review considers the complete consequence of each alternative.
| Evaluation Area | Key Question |
|---|---|
| Function | What must the system actually do? |
| Capital Cost | What will it cost to procure and construct? |
| Lifecycle Cost | What will it cost to operate, maintain, and replace? |
| Performance | Will it meet the required capacity and reliability? |
| Safety | Does the alternative create new hazards or reduce safeguards? |
| Constructability | Can it be built efficiently under actual site conditions? |
| Schedule | Will it accelerate or delay project execution? |
| Maintainability | Can operators inspect, access, repair, and replace it effectively? |
| Procurement | Does it reduce or increase supply-chain exposure? |
| Operations | How will it affect the facility after construction? |
| Risk | What new uncertainties or failure modes are introduced? |
| Sustainability | Can material, energy, or resource demand be reduced? |
Not every criterion carries the same weight on every project.
For a remote mining facility, logistics and maintainability may be particularly important.
For a municipal infrastructure project, durability, lifecycle cost, and future maintenance access may dominate.
For a brownfield industrial project, shutdown duration and tie-in complexity may become critical.
The VE process should reflect the actual priorities of the project.
The Value Engineering Process
Formal Value Methodology follows a structured job plan. SAVE International’s current framework includes eight phases: Preparation, Information, Function Analysis, Creativity, Evaluation, Development, Presentation, and Implementation.
For construction projects, those phases can be applied as follows.
1. Preparation
Before alternatives are generated, the team defines what is being reviewed and why.
This may involve identifying:
- Project objectives
- Areas of high cost
- Cost overruns
- Technical constraints
- Owner priorities
- Schedule pressures
- Known risks
- Potential VE targets
The team should also establish non-negotiable requirements.
Safety, regulatory obligations, minimum performance requirements, or critical owner standards should not accidentally become variables during the exercise.
2. Information
The VE team develops a common understanding of the project.
Relevant information may include:
- Basis of Design
- Drawings
- Specifications
- Cost estimates
- Equipment information
- Project schedule
- Site constraints
- Construction strategy
- Procurement information
- Operating requirements
- Maintenance requirements
- Owner standards
This phase is important because proposed savings based on incomplete information can create larger costs elsewhere.
3. Function Analysis
Function analysis is the core of Value Methodology. SAVE identifies it as the stage where teams define, analyze, and prioritize the functions a project or system must perform.
Instead of describing an existing solution, the team describes what the solution must accomplish.
For example:
| Existing Element | Required Function |
|---|---|
| Foundation | Support load |
| Drainage system | Control water |
| Pipe insulation | Reduce heat loss |
| Structural platform | Provide access |
| Pump | Move fluid |
| Building envelope | Protect interior |
This change in language is powerful.
If the team asks:
“How can we make this concrete foundation cheaper?”
the discussion is limited to the existing solution.
If the team asks:
“What is the most effective way to support this equipment under these site conditions?”
more alternatives become possible.
4. Creative Phase
Once the required functions are understood, the team generates alternatives.
At this stage, ideas should not be rejected too quickly.
Potential alternatives may involve:
- Different materials
- Revised layouts
- Alternative structural systems
- Equipment changes
- Standardization
- Modularization
- Prefabrication
- Alternative foundation concepts
- Different utility routes
- Construction method changes
- Design simplification
- Different operating strategies
The purpose of this stage is to broaden the solution space before detailed evaluation begins.
5. Evaluation
Ideas are then screened against agreed project criteria.
The team may consider:
- Technical feasibility
- Capital cost
- Lifecycle cost
- Safety
- Performance
- Reliability
- Schedule
- Constructability
- Operations
- Maintenance
- Procurement
- Environmental impacts
- Project risk
Some ideas will be rejected immediately.
Others may warrant further engineering.
The strongest alternatives move into development.
6. Development
A VE idea becomes useful only when it is developed enough for a decision.
A credible proposal should explain:
- Existing design basis
- Proposed change
- Required function
- Technical justification
- Capital cost impact
- Lifecycle implications
- Schedule impact
- Constructability
- Affected disciplines
- Risks
- Required design changes
At this point, preliminary engineering calculations or layouts may be necessary.
A proposal should not be accepted solely because a spreadsheet shows a cost reduction.
7. Presentation
The developed alternatives are presented to the owner or appropriate decision-makers.
The goal is to make the trade-offs clear.
A strong VE recommendation allows the owner to understand:
- What changes
- What remains unchanged
- Expected benefit
- Technical implications
- Risks
- Required decisions
A VE recommendation is not automatically an approved design change.
Formal project approval should still occur through the appropriate engineering and change-management process.
8. Implementation
Once an alternative is accepted, it must be integrated into the project correctly.
This may require updates to:
- Drawings
- Calculations
- Specifications
- Equipment lists
- Cost estimates
- Procurement documents
- Project schedule
- Risk registers
- Construction documentation
Affected engineering disciplines should also be coordinated.
A good VE concept can lose much of its benefit if it is implemented late or inconsistently.
When Should Value Engineering Be Performed?
Value engineering can be performed at several project stages, but the potential benefit and cost of change vary considerably.
Feasibility
Early project development offers the greatest freedom to challenge fundamental concepts.
Potential areas include:
- Site selection
- Major technologies
- Process configuration
- Infrastructure concepts
- Capacity
- Major execution strategies
Changes are relatively inexpensive because little detailed design has been completed.
Front-End Engineering Design
FEED is often one of the strongest opportunities for value engineering.
By this stage, the project has enough technical definition for meaningful comparison, but major design decisions may still be flexible.
Potential VE areas include:
- Facility layout
- Equipment configuration
- Structural concepts
- Utility philosophy
- Site development
- Process configuration
- Material selection
- Construction strategy
This balance between available information and remaining design flexibility makes FEED particularly valuable for structured VE reviews.
Detailed Design
Value engineering can still produce benefits during detailed design.
However, changes may now affect completed engineering work.
A proposal may require revisions to:
- Calculations
- Drawings
- Specifications
- Vendor packages
- Other disciplines
Savings should therefore be evaluated against redesign cost and schedule impact.
Procurement
Procurement may create opportunities through:
- Alternative equipment
- Standard products
- Vendor proposals
- Material alternatives
- Supply-chain options
However, substitutions should be technically reviewed rather than accepted solely because they have a lower purchase price.
Construction
Value engineering can also occur during construction.
Contractors may identify practical alternatives related to:
- Installation
- Sequencing
- Temporary works
- Materials
- Access
- Prefabrication
At this stage, however, the cost of change may be significant because materials may already have been purchased and construction may already be underway.
The earlier a high-impact VE decision is made, the easier it is generally to capture its benefit without creating redesign or rework.
Why FEED Is a Critical Stage for Value Engineering
FEED occupies an important position between conceptual development and detailed design.
At this stage, the team typically understands:
- Major project requirements
- Preferred concept
- Key equipment
- Preliminary layouts
- Design criteria
- Major interfaces
- Preliminary cost
- Project risks
At the same time, many decisions have not yet become expensive to change.
This creates an opportunity to challenge major cost drivers before the project becomes highly committed.
Examples might include:
- Changing facility arrangement to reduce piping
- Revising equipment configuration
- Optimizing building footprints
- Simplifying utility systems
- Reviewing foundation concepts
- Reducing unnecessary redundancy
- Improving access and constructability
- Standardizing equipment
Value engineering performed after detailed design is substantially complete may still identify the same opportunities, but capturing them may require much more rework.
Practical Example: Value Engineering an Industrial Equipment Foundation
Consider an industrial project where a large piece of equipment is supported on a reinforced concrete foundation.
The original design meets all technical requirements but creates several construction challenges:
- Large excavation
- High concrete volume
- Significant reinforcing steel
- Conflicts with underground utilities
- Difficult construction access
- Extended construction duration
Rather than simply reducing concrete or reinforcement, the team revisits the required function:
Support the equipment loads while maintaining stability, alignment, and required performance.
After coordination between the structural, mechanical, civil, and construction teams, an alternative arrangement is developed.
The equipment position is adjusted slightly, load transfer is optimized, and the foundation footprint is reduced while maintaining the required structural performance.
| Criterion | Original Design | VE Alternative |
|---|---|---|
| Structural performance | Meets requirements | Meets requirements |
| Concrete quantity | Higher | Lower |
| Excavation | Higher | Lower |
| Reinforcing steel | Higher | Reduced |
| Utility conflicts | Several | Fewer |
| Construction duration | Longer | Shorter |
| Equipment access | Acceptable | Maintained |
| Required function | Achieved | Achieved |
The important point is that the cost reduction does not come from accepting a weaker foundation.
It comes from finding a more efficient way to perform the same required function.
That is value engineering.
Life-Cycle Cost vs. Initial Cost
Focusing only on initial price can lead to false savings.
Consider two pumps designed for the same duty.
Pump A
- Lower purchase price
- Higher energy consumption
- More frequent maintenance
- Shorter maintenance intervals
Pump B
- Higher purchase price
- Lower energy demand
- Better efficiency
- Longer maintenance intervals
If the decision is based only on procurement cost, Pump A may appear more attractive.
But the owner may operate the pump for 15 or 20 years.
Once energy, maintenance, downtime, spare parts, and replacement are considered, Pump B may have the lower overall lifecycle cost.
This same principle can apply to:
- Coating systems
- Roofing
- Structural systems
- Electrical equipment
- HVAC systems
- Pumps
- Motors
- Lighting
- Pavement
- Piping materials
Value engineering therefore asks whether the project is optimizing total value, not simply reducing today’s invoice.
What Makes a Good Value Engineering Proposal?
A practical VE proposal should answer at least the following questions:
- What is being changed?
- Why is the change being proposed?
- What function must be maintained?
- Does the alternative meet that function?
- What technical assumptions support the proposal?
- What is the capital cost impact?
- What is the lifecycle cost impact?
- Does the schedule change?
- Does construction become easier or more difficult?
- Which disciplines are affected?
- Does maintenance change?
- Are operating requirements affected?
- What risks are reduced?
- What new risks are introduced?
- Which project documents must be revised?
If these questions cannot be answered, the proposal may require further development before it is presented as a value improvement.
When Value Engineering Goes Wrong
Value engineering can create poor outcomes when the focus shifts from value to immediate savings.
Replacing Materials Based Only on Price
A less expensive material may have:
- Lower durability
- Higher maintenance requirements
- Different installation requirements
- Reduced environmental resistance
- Shorter expected service life
Price should be evaluated together with performance.
Removing Redundancy Without Reviewing Reliability
Redundancy can appear expensive when viewed only as additional equipment.
However, in critical facilities, redundancy may protect:
- Production
- Safety
- Service continuity
- Maintenance flexibility
Removing it requires a reliability and operational assessment—not simply a cost comparison.
Ignoring Maintenance Access
A layout change may reduce piping or building area but create difficult access to:
- Valves
- Motors
- Instrumentation
- Filters
- Electrical equipment
Savings during construction can become years of additional maintenance cost.
Making Late Changes During Detailed Design
A change that saves money in one discipline can create redesign across several others.
Late VE proposals should account for:
- Engineering rework
- Procurement changes
- Schedule effects
- Contractor impacts
- Previously completed work
The gross saving and net project saving may be very different.
Ignoring Engineering Interfaces
Changing equipment can affect:
- Structural loads
- Foundations
- Electrical demand
- Piping
- Controls
- Drainage
- Access
- Ventilation
Evaluating only the purchasing difference creates an incomplete comparison.
Ignoring Lifecycle Cost
Reducing CAPEX while significantly increasing operating or maintenance cost may reduce total project value.
Lifecycle impacts should be considered whenever they are material to the decision.
Calling De-Scoping “Value Engineering”
Removing required project scope may be a legitimate budget decision.
But it should be described accurately.
If a project removes performance, capacity, reliability, or required functionality to meet a lower budget, that is a scope trade-off, not necessarily value engineering.
Value Engineering vs. Design Optimization
Value engineering and design optimization overlap, but they are not identical.
Design optimization usually occurs continuously as engineers refine a solution.
Examples include:
- Reducing structural weight
- Improving pipe routing
- Adjusting equipment layout
- Simplifying details
Value engineering is generally a more structured review in which the project team deliberately analyzes required functions, resources, alternatives, and value.
Both approaches can improve a project.
The difference is primarily the structured function-based methodology and decision process used in formal VE.
Value Engineering vs. Constructability Review
These processes are also related but have different primary objectives.
| Value Engineering | Constructability Review |
|---|---|
| Focuses on value relative to required function | Focuses on how effectively the design can be built |
| Reviews capital and lifecycle considerations | Focuses strongly on construction execution |
| May change the basic design solution | Often improves execution of the proposed design |
| Evaluates multiple project criteria | Emphasizes access, sequencing, methods, and logistics |
| May involve operations and maintenance | Primarily construction-focused |
| Can be performed throughout design | Most useful before construction commitments are fixed |
Constructability reviews can provide valuable input into VE.
For example, a contractor may identify that an alternative connection detail eliminates difficult field welding.
The VE process can then evaluate whether that alternative also meets structural, durability, cost, and lifecycle requirements.
The Role of Multi-Discipline Engineering in Value Engineering
Value engineering should rarely be performed in isolation on complex projects.
A change that benefits one discipline may create additional cost or risk somewhere else.
Consider relocating a major piece of process equipment.
The mechanical team may reduce piping length.
But the change could also affect:
- Structural foundations
- Civil grading
- Underground utilities
- Electrical cable routing
- Process connections
- Instrumentation
- Drainage
- Maintenance access
- Lifting requirements
- Construction sequencing
Without multi-discipline review, the team may record savings before understanding the total project impact.
This is why formal Value Methodology is intentionally multidisciplinary.
The strongest VE decisions typically involve the disciplines responsible for design, construction, operation, cost, and project delivery.
Value Engineering in Canadian Construction Projects
The principles of value engineering are universal, but project conditions influence which alternatives create real value.
Canadian projects may need to consider factors such as:
- Freeze-thaw exposure
- Cold-weather construction
- Snow and ice
- Corrosion and de-icing salts
- Remote construction locations
- Labour availability
- Material transportation
- Long-lead equipment
- Seasonal construction windows
- Existing infrastructure
- Brownfield constraints
- Energy consumption
For a remote mining project, reducing the number of specialized components may lower logistics and spare-parts requirements.
For municipal infrastructure, selecting a more durable material may justify higher capital cost if it reduces future rehabilitation.
For an operating industrial facility, an option that reduces shutdown duration may provide significant value even if the construction cost itself changes very little.
Context matters.
A VE alternative should therefore be evaluated against the actual environment in which the asset will be built, operated, and maintained.
A Simple Value Engineering Decision Framework
Before accepting a proposed VE change, the project team can use a simple screening framework.
| Question | Why It Matters |
|---|---|
| Does it maintain the required function? | Prevents savings that remove project value |
| Is required performance maintained? | Identifies technical trade-offs |
| Is safety maintained? | Protects non-negotiable requirements |
| What is the net capital cost impact? | Identifies actual project savings |
| What is the lifecycle cost? | Prevents CAPEX-only decisions |
| What is the schedule impact? | Identifies execution benefits or delays |
| Which disciplines are affected? | Prevents interface problems |
| Does maintenance become easier or harder? | Protects operational value |
| Are procurement risks affected? | Identifies supply-chain implications |
| What new risks are introduced? | Makes trade-offs transparent |
| What engineering must be revised? | Captures implementation cost |
A proposal that performs well across these questions has a much stronger basis for being described as a genuine value improvement.
Common Value Engineering Opportunities in Construction
Typical areas where project teams may identify value include:
Material Optimization
Selecting materials based on required performance, environment, availability, durability, and lifecycle cost.
Structural Optimization
Reviewing framing systems, member arrangements, foundation concepts, and load paths to reduce unnecessary complexity or material.
Equipment Selection
Comparing equipment based on capacity, efficiency, reliability, maintenance, availability, and total ownership cost.
Layout Optimization
Reducing unnecessary distances, improving access, simplifying interfaces, and improving equipment arrangement.
Standardization
Reducing unnecessary equipment or component variation can simplify:
- Procurement
- Installation
- Spare parts
- Maintenance
- Training
Modularization and Prefabrication
Moving suitable work from the field to controlled fabrication environments may improve quality and reduce site labour or schedule exposure.
Utility Routing
Better routing can reduce:
- Pipe length
- Excavation
- Cable length
- Crossings
- Structural supports
- Utility conflicts
Foundation Optimization
Revisiting foundation type, geometry, loading, geotechnical assumptions, or equipment layout can sometimes reduce major quantities.
Construction Sequencing
An alternative sequence may reduce temporary works, equipment mobilization, shutdown duration, or schedule risk.
Energy and Maintenance Optimization
Higher-performing systems may provide stronger lifecycle value even where first cost is higher.
None of these changes is automatically value engineering.
They create value only when the required function and broader project impacts have been properly evaluated.
Key Takeaways
- Value engineering is not simply cost cutting.
- The required function should be understood before alternatives are developed.
- The lowest initial cost is not necessarily the highest-value solution.
- Capital cost, lifecycle cost, performance, safety, constructability, schedule, and maintenance should be considered together.
- Function analysis helps teams challenge the solution without compromising the underlying requirement.
- VE generally creates the greatest opportunity before design decisions become expensive to change.
- FEED is often an effective stage for evaluating major value opportunities.
- Multi-discipline review helps prevent savings in one area from creating additional costs elsewhere.
- Every accepted VE proposal should be technically evaluated and formally incorporated into project documentation.
Conclusion
Effective value engineering does not begin by searching for things to remove.
It begins by understanding what the project must accomplish.
Once the required functions are clear, engineers, owners, contractors, and other project stakeholders can evaluate whether the current design is the most effective way to deliver them.
Sometimes the result is a lower-cost material.
Sometimes it is a different layout, foundation concept, equipment selection, construction method, or procurement strategy.
And sometimes the original design remains the best option after alternatives are evaluated.
The important question is not:
“What can we remove to make the project cheaper?”
It is:
“Is there a better way to deliver the required function?”
When the answer reduces unnecessary cost or complexity while protecting performance, safety, reliability, constructability, and long-term operation, the project has achieved genuine value engineering.
Frequently Asked Questions
What is value engineering in construction?
Value engineering in construction is a structured process used to improve project value by analyzing required functions and evaluating alternative ways to achieve them. The objective may include reducing cost, simplifying construction, improving performance, reducing lifecycle cost, or managing risk without compromising essential project requirements.
Is value engineering the same as cost cutting?
No. Cost cutting focuses primarily on reducing expenditure and may involve reducing scope or performance. Value engineering evaluates whether the required function can be delivered more effectively while considering cost, performance, safety, quality, lifecycle impacts, and other project criteria.
When should value engineering be performed?
Value engineering can be performed throughout project development, but early stages generally offer the greatest opportunity. Feasibility and FEED are particularly useful because major design decisions can still be changed without extensive redesign. VE can also occur during detailed design, procurement, and construction, although late changes may create additional cost or schedule impacts.
What are the main steps in the value engineering process?
A formal Value Methodology commonly includes Preparation, Information, Function Analysis, Creativity, Evaluation, Development, Presentation, and Implementation. The process moves from understanding project requirements to defining functions, generating alternatives, evaluating them, developing viable proposals, and implementing approved changes.
How does value engineering reduce construction costs?
VE can reduce construction costs by eliminating unnecessary complexity, optimizing materials and quantities, simplifying layouts, improving constructability, reducing utility conflicts, standardizing components, using prefabrication, improving equipment selection, or identifying more efficient construction approaches.
Does value engineering compromise quality?
It should not. Genuine value engineering is intended to protect the required function and performance while improving overall value. If a proposal reduces required quality, capacity, safety, reliability, or functionality purely to lower cost, it may be a scope reduction rather than value engineering.
What is the difference between value engineering and value management?
The terms are often closely related and, in formal Value Methodology, may sometimes be used within the same broader discipline. In practice, value engineering is frequently associated with technical project and design reviews, while value management may be used more broadly for strategic decisions, objectives, and stakeholder value.
What role does lifecycle cost play in value engineering?
Lifecycle cost helps evaluate alternatives beyond their initial purchase or construction cost. It can include energy, maintenance, repairs, downtime, replacement, and other costs incurred during the asset’s operating life. An option with a higher initial cost may provide better overall value if its long-term cost is lower.
Can value engineering be performed during construction?
Yes. Contractors and project teams may identify alternative materials, construction methods, sequencing, prefabrication opportunities, or other improvements during construction. However, proposed changes should be reviewed for engineering, contractual, procurement, schedule, and lifecycle implications before implementation.
Who should participate in a value engineering review?
The appropriate team depends on the project, but complex construction VE reviews may involve project owners, project managers, civil, structural, process, mechanical and electrical engineers, cost specialists, construction personnel, procurement specialists, operators, maintenance representatives, and other relevant stakeholders. A multidisciplinary team helps ensure that savings in one area do not create unintended problems elsewhere.
The Value Engineering Process
What Makes a Good Value Engineering Proposal?