Complex engineering projects can involve dozens of technical decisions made by different people at different stages.
A process engineer may establish equipment capacity. A structural engineer may develop foundation loads. Civil engineers may set site elevations and drainage criteria, while electrical engineers work from expected equipment demand.
Each decision can be technically reasonable on its own. Problems begin when those decisions are based on different assumptions.
That is one of the main reasons a Basis of Design, commonly called a BOD, is so important.
A well-developed BOD provides a common technical reference for the project. It documents the criteria, assumptions, design philosophy, system concepts, constraints, and key decisions that engineers use as the project moves from early definition into Front-End Engineering Design (FEED) and eventually Detailed Design.
It helps answer a fundamental project question:
What information and assumptions are we designing from, and why have we made these engineering decisions?
What Is a Basis of Design (BOD)?
A Basis of Design (BOD) is an engineering document that records the technical criteria, assumptions, design approach, system concepts, calculations, and key decisions used to translate project requirements into an engineering solution.
It provides the technical reasoning behind the design.
A BOD may document information such as:
- Project objectives
- Design criteria
- Applicable codes and standards
- Site conditions
- Operating requirements
- Major design assumptions
- Equipment requirements
- System capacities
- Environmental conditions
- Discipline interfaces
- Owner requirements
- Design constraints
- Outstanding technical decisions
The BOD is therefore more than a list of numbers or design codes.
A useful Basis of Design should help someone understand:
What was assumed → What criteria were used → What solution was selected → Why that solution was selected
This becomes increasingly valuable as a project grows in complexity and more engineering disciplines become involved.
Why Is a Basis of Design Important?
A project can have accurate drawings and calculations while still suffering from inconsistent assumptions.
The BOD helps create a common technical foundation for the project team.
Creates a Common Technical Reference
Engineers need to know which information governs the design.
For example:
- What design life should be used?
- Which climatic data apply?
- What equipment capacity is required?
- What loads should be considered?
- What future expansion should be accommodated?
- Which codes and standards govern the work?
Documenting these requirements reduces the risk that individual disciplines develop their own assumptions independently.
This becomes particularly important on multi-discipline engineering projects involving civil, structural, process, mechanical, and electrical systems.
Documents Engineering Decisions
Projects often continue for months or years.
During that time:
- Team members change
- Vendors provide new information
- Designs evolve
- Owners revise requirements
- New site information becomes available
Without a documented technical basis, it may become difficult to understand why an earlier decision was made.
A BOD preserves that reasoning.
Instead of relying on someone’s memory, the project team can refer to the documented basis behind the design.
Reduces Design Inconsistency
Consider an equipment package that weighs more than originally anticipated.
That change may affect:
- Structural foundations
- Building framing
- Lifting requirements
- Civil grading
- Mechanical connections
- Electrical requirements
- Maintenance access
If one discipline receives the updated information but others continue working from an earlier assumption, coordination problems can develop.
A controlled BOD helps create a shared basis for major design inputs.
Supports Design Reviews
Design reviewers need a reference against which the engineering can be evaluated.
The question is not simply:
“Is this calculation correct?”
It is also:
“Was this calculation based on the correct project criteria?”
A good BOD makes assumptions and design parameters visible, which improves the effectiveness of the engineering design review process.
Preserves Project Knowledge
One of the less obvious benefits of a Basis of Design is knowledge retention.
Important technical information can otherwise become scattered across:
- Emails
- Meeting minutes
- Calculation files
- Vendor documents
- Marked-up drawings
- Individual engineer notes
The BOD provides a more structured record of the project’s technical basis.
This is particularly valuable when future engineers need to understand an existing facility before completing an expansion, upgrade, or brownfield modification.
Basis of Design vs. Owner’s Project Requirements
The Basis of Design and Owner’s Project Requirements are closely related, but they serve different purposes.
A useful way to understand the distinction is:
Owner’s Project Requirements ask: What does the owner need?
The Basis of Design explains: How will the engineering design respond to those needs?
| Owner’s Project Requirements | Basis of Design |
|---|---|
| Defines the owner’s needs and objectives | Defines the engineering response |
| Focuses on required outcomes | Focuses on technical approach |
| Establishes functional expectations | Documents design criteria and assumptions |
| May include capacity, reliability or operational goals | Explains how those goals influence the design |
| Primarily owner-focused | Primarily engineering and design-focused |
For example, an owner may require:
The facility must support a future 25% increase in production capacity.
The BOD may then describe how that requirement affects:
- Equipment sizing
- Utility capacity
- Electrical infrastructure
- Structural allowance
- Site layout
- Space for future expansion
The owner’s requirement defines the objective. The BOD establishes how that requirement influences the engineering solution.
Basis of Design vs. Design Criteria
Another common source of confusion is the difference between a Basis of Design and design criteria.
Design criteria are usually one part of the broader BOD.
Design Criteria
Design criteria define specific technical parameters used by engineers.
Examples may include:
- Design temperature
- Wind load
- Snow load
- Design pressure
- Design flow
- Equipment capacity
- Structural design life
- Electrical voltage
- Corrosion allowance
- Maximum allowable velocity
- Required redundancy
These values are used directly in engineering calculations and equipment selection.
Basis of Design
The Basis of Design includes design criteria but goes further.
It may also document:
- Why those criteria were selected
- Where the information came from
- Design assumptions
- System philosophy
- Equipment concepts
- Project constraints
- Operating requirements
- Discipline interfaces
- Major technical decisions
- Outstanding information
| Design Criteria | Basis of Design |
|---|---|
| Defines technical parameters | Defines the overall technical basis |
| Often numerical | Includes narrative and numerical information |
| Used directly in calculations | Provides context for engineering decisions |
| May apply to one discipline | Coordinates information across disciplines |
| Forms part of the BOD | Contains criteria, assumptions and design philosophy |
In simple terms, design criteria tell engineers what values to design to, while the BOD explains the larger technical framework in which those values are being used.
What Should a Basis of Design Include?
There is no single BOD format that applies to every engineering project.
The content should reflect the industry, project stage, technical complexity, owner requirements, and disciplines involved.
However, a typical Basis of Design may include the following sections.
| BOD Section | Typical Content |
|---|---|
| Project Overview | Objectives, project description and intended use |
| Scope and Boundaries | Included systems, exclusions and battery limits |
| Design Inputs | Surveys, reports, owner data and vendor information |
| Codes and Standards | Applicable regulatory and technical requirements |
| Design Criteria | Loads, capacities, environmental and operating conditions |
| Assumptions | Information assumed until confirmed |
| Site Conditions | Climate, geotechnical conditions and existing infrastructure |
| System Concepts | How major systems are intended to operate |
| Discipline Requirements | Civil, structural, process, mechanical and electrical basis |
| Equipment Basis | Major equipment requirements and selection criteria |
| Interfaces | Relationships between disciplines and systems |
| Operational Requirements | Operating modes, access and maintenance requirements |
| Constraints | Site, schedule, construction and operational limitations |
| Risks and Open Items | Outstanding information and unresolved decisions |
| References | Drawings, studies, specifications and source documents |
The objective is not to create the longest possible document.
The objective is to capture the technical information that materially influences the design.
Typical Basis of Design Content by Engineering Discipline
On a multidisciplinary project, each discipline may contribute different information to the overall BOD.
Civil Engineering
Civil design considerations may include:
- Site grading criteria
- Design elevations
- Road geometry
- Pavement assumptions
- Stormwater criteria
- Drainage philosophy
- Earthworks requirements
- Underground utilities
- Site access
- Erosion and sediment control
- Existing site conditions
The civil basis often establishes the physical framework within which the rest of the facility must fit.
Structural Engineering
Structural BOD information may include:
- Applicable structural codes
- Material requirements
- Design life
- Dead and live loads
- Environmental loads
- Equipment loads
- Dynamic loads
- Foundation criteria
- Structural systems
- Deflection limits
- Durability requirements
Where vendor information is not yet available, assumptions should be identified clearly so that they can be confirmed later.
Process Engineering
Process design information may include:
- Design capacity
- Operating capacity
- Process flow rates
- Design pressure and temperature
- Process philosophy
- Material characteristics
- Utility requirements
- Equipment duty
- Operating scenarios
- Process redundancy
- Control requirements
Process criteria often become major inputs for mechanical, electrical, structural, and instrumentation design.
Mechanical Engineering
Mechanical BOD content may include:
- Equipment design requirements
- Piping design criteria
- Utility systems
- Materials of construction
- Design pressure
- Design temperature
- Equipment redundancy
- Maintenance philosophy
- Equipment access
- Piping velocity criteria
- Insulation requirements
Mechanical decisions should remain coordinated with process conditions, structural support requirements, electrical loads, and facility layout.
Electrical Engineering
Electrical criteria may include:
- Available utility supply
- Voltage levels
- Electrical load assumptions
- Distribution philosophy
- Equipment demand
- Redundancy requirements
- Emergency power
- Grounding requirements
- Lighting criteria
- Hazardous area requirements
- Future capacity
As equipment selections develop, the electrical basis may need to be updated to reflect confirmed loads and vendor information.
When Is a Basis of Design Developed?
A BOD should not be viewed as a document written once and then forgotten.
It normally evolves as project definition improves.
During Feasibility
During Feasibility Studies, the technical basis may still be relatively high-level.
The project team may be evaluating:
- Alternative concepts
- Preliminary capacity
- Site constraints
- Major infrastructure
- Utilities
- Technical viability
- Preliminary project risks
Many assumptions may still be open.
The important point is to identify them clearly rather than presenting uncertain information as confirmed design data.
During FEED
The BOD typically becomes much more important during Front-End Engineering Design (FEED).
At this stage, the project begins establishing:
- Preferred technical concept
- Major equipment requirements
- System philosophy
- Design criteria
- Preliminary layouts
- Discipline interfaces
- Utility requirements
- Operating assumptions
- Project constraints
FEED reduces major technical uncertainty before the project commits significant resources to detailed engineering, procurement, and construction.
A well-developed BOD records the basis behind those decisions.
During Detailed Design
During Detailed Design, assumptions increasingly become confirmed engineering inputs.
Examples include:
- Final vendor equipment data
- Confirmed loads
- Survey information
- Geotechnical information
- Equipment connections
- Electrical demand
- Final operating requirements
The BOD should remain aligned with significant design decisions as the engineering develops.
Detailed design drawings and calculations should not be based on criteria that contradict the current project basis.
During Construction
Construction can reveal information that was unavailable during design.
Examples include:
- Unexpected field conditions
- Differences between record drawings and actual conditions
- Vendor substitutions
- Utility conflicts
- Owner-requested changes
When a construction-stage change alters a major design assumption or system philosophy, the project team should consider whether the BOD also requires revision.
This creates an important connection between the design basis and Construction Support.
How Does the BOD Connect FEED to Detailed Design?
The Basis of Design plays an important role in maintaining continuity between early project development and detailed engineering.
A simplified project flow may look like:
Project Requirements → Feasibility → FEED → Detailed Design → Construction Documentation
The BOD develops throughout this process rather than appearing at one isolated point.
During FEED, the project establishes many of the technical decisions that detailed engineering will later develop.
For example, FEED may establish:
- Equipment capacity
- Structural concepts
- Utility philosophy
- Preliminary site layout
- Process requirements
- Design criteria
- Major project interfaces
During Detailed Design, these decisions are translated into:
- Calculations
- Drawings
- Technical specifications
- Equipment documentation
- Schedules
- Construction-ready engineering packages
The BOD provides continuity by documenting the assumptions and criteria behind those decisions.
This is also why a strong Engineering Design Process depends on reliable project inputs before large amounts of detailed engineering are completed.
Practical Example: Basis of Design for an Industrial Facility Expansion
Consider an existing industrial facility that needs to increase production capacity by 25%.
The owner wants to retain as much existing infrastructure as practical while minimizing operational disruption.
The project requirement sounds relatively simple:
Increase production capacity by 25%.
But engineers need much more information before the facility can be designed.
The BOD might document the following.
Process Requirements
- Existing production capacity
- Required future capacity
- Operating hours
- Process flow requirements
- Required redundancy
Existing Infrastructure
- Existing equipment to remain
- Existing utilities
- Available electrical capacity
- Existing structures
- Existing process connections
Structural Basis
- New equipment loads
- Existing structural capacity assumptions
- Foundation requirements
- Vibration criteria
Electrical Basis
- Existing electrical service
- Additional estimated load
- Required equipment voltage
- Emergency power requirements
Brownfield Constraints
- Shutdown windows
- Tie-in requirements
- Restricted construction areas
- Existing operations that must remain active
Future Requirements
- Additional expansion allowance
- Maintenance access
- Space for future equipment
Without a coordinated design basis, different disciplines could interpret the project differently.
For example, the process team might assume that existing utilities have enough capacity for the expansion while the mechanical or electrical team may be planning upgrades.
The BOD makes these assumptions visible so they can be confirmed before they become embedded in detailed design.
Example Basis of Design Table
A BOD may summarize important design information in a format similar to the following.
| Design Item | Requirement or Assumption | Engineering Basis |
|---|---|---|
| Design Life | 30 years | Owner requirement |
| Production Capacity | 25% expansion | Project objective |
| Climatic Conditions | Project-specific design data | Applicable Canadian climatic information |
| Structural Loads | Equipment loads plus applicable load combinations | Structural design criteria |
| Electrical Supply | Existing service with defined capacity upgrade | Electrical study |
| Maintenance Access | Required around major equipment | Owner and O&M requirement |
| Existing Utilities | To be verified before detailed design | Existing records and field investigation |
| Future Expansion | Space for one additional unit | Owner planning requirement |
The exact format is less important than traceability.
Someone reviewing the project should be able to identify:
What is the requirement? What information supports it? Is it confirmed or assumed?
What Should Not Be Missing From a BOD?
The content will vary, but several items are particularly important.
Sources for Important Inputs
A design value without a source can become difficult to verify later.
Important criteria should indicate whether they come from:
- Owner requirements
- Applicable codes
- Site investigation
- Vendor information
- Engineering calculations
- Existing records
- Industry standards
Clearly Identified Assumptions
Engineering frequently begins before every piece of information is available.
That is normal.
The problem occurs when assumptions are not identified as assumptions.
For example:
Equipment operating weight assumed to be 18,000 kg pending vendor confirmation.
is much more useful than simply listing:
Equipment weight: 18,000 kg.
The first statement tells future reviewers that the information still requires confirmation.
Applicable Code Editions
Referencing only a code name may not always be sufficient.
Where relevant, the applicable edition or governing requirement should be documented so that different disciplines do not unknowingly work to different criteria.
Discipline Interfaces
Many major design problems occur between disciplines rather than within them.
The BOD should help define interfaces such as:
- Equipment loads to structural design
- Process conditions to mechanical equipment
- Mechanical equipment to electrical demand
- Site elevations to structural and drainage design
- Equipment location to maintenance access
- Utility routing to civil and structural systems
These interfaces are a key reason multi-discipline engineering coordination matters.
Open Items and Unresolved Decisions
A BOD does not need to pretend every question has already been answered.
Outstanding items should be visible.
Examples include:
- Vendor data pending
- Geotechnical investigation incomplete
- Utility capacity awaiting confirmation
- Owner decision required
- Survey information outstanding
Visibility allows the project team to manage these items before they affect downstream design.
Common Basis of Design Mistakes
A BOD can exist without actually being useful.
Several problems commonly reduce its value.
Treating the BOD as a Generic Template
Templates can help organize information, but copying content from a previous project without validating it creates risk.
Every criterion should reflect the actual project.
Generic statements that do not influence design add little value.
Recording Numbers Without Their Source
A design load or capacity may look authoritative once written into a document.
Without knowing where it came from, future engineers may assume it was confirmed when it was actually preliminary.
Traceability matters.
Hiding Assumptions
Assumptions should be explicit.
This is particularly important during early engineering stages when vendor data, field information, or owner decisions may still be incomplete.
Failing to Update the BOD
A BOD that reflects the project at 20% design but is never updated can become misleading during later stages.
Major changes to criteria, system philosophy, capacity, or project requirements should be reflected where appropriate.
Ignoring Discipline Interfaces
Individual discipline criteria may be correct while the overall project remains inconsistent.
A strong BOD should identify the information that must move between disciplines.
Confusing the BOD With a Technical Specification
A technical specification and Basis of Design serve different purposes.
A specification generally describes requirements for materials, equipment, fabrication, installation, or performance.
A BOD explains the technical basis behind the design.
In simple terms:
BOD: Why are we designing it this way?
Specification: What requirements must the supplied or constructed system meet?
How Should Design Changes Be Reflected in the BOD?
Not every drawing revision requires the Basis of Design to change.
However, changes that affect fundamental engineering assumptions should trigger a review.
Examples may include changes to:
- Design capacity
- System philosophy
- Major equipment
- Design life
- Applicable criteria
- Operating conditions
- Structural loads
- Utility availability
- Redundancy
- Future expansion
- Owner requirements
A useful change process might follow:
Change Identified → Technical Review → BOD Impact Review → Multi-Discipline Coordination → Updated Engineering Documents
This connection becomes particularly important during Project Management and Construction Support, when design changes need to be controlled across cost, schedule, engineering, procurement, and field execution.
Who Prepares and Approves the Basis of Design?
The engineering or design team usually develops the Basis of Design.
However, a reliable BOD depends on input from several project participants.
These may include:
- Project owner
- Operations personnel
- Maintenance personnel
- Project manager
- Civil engineers
- Structural engineers
- Process engineers
- Mechanical engineers
- Electrical engineers
- Vendors
- Commissioning specialists
- Other technical consultants
Responsibility for formal review or approval depends on the project structure and contract.
On some projects, the owner formally reviews the document. On others, the BOD primarily functions as a controlled design-team document.
Regardless of the approval process, key owner requirements and unresolved decisions should be clearly identified.
Basis of Design for Brownfield vs. Greenfield Projects
The importance of certain BOD sections changes significantly depending on whether the project is brownfield or greenfield.
| Brownfield Project | Greenfield Project |
|---|---|
| Existing conditions strongly influence design | Greater freedom to establish new systems |
| Field verification is often critical | New survey and design information can be developed systematically |
| Existing utility capacity must be understood | Utilities can be designed around new demand |
| Tie-ins may control design decisions | Interfaces are mostly between new systems |
| Shutdown constraints can be critical | Construction sequencing is generally more flexible |
| Existing records may be incomplete | Project documentation develops from the start |
| Integration risk is often high | Interface conditions are generally easier to define |
For brownfield projects in particular, the BOD should distinguish carefully between:
- Verified existing conditions
- Information obtained from historical drawings
- Assumptions requiring field confirmation
This helps prevent old or incomplete information from being treated as confirmed design input.
It also connects closely with Asset Condition Assessment when existing infrastructure is expected to remain in service or support a new project.
Why a Good BOD Improves Construction and Commissioning
The Basis of Design is created during engineering, but its value can extend well beyond design.
During construction, it can help the project team understand the intent behind important technical requirements.
If a contractor proposes a substitution, engineers can evaluate whether the alternative still satisfies the original basis.
During Engineering Support During Construction, this context can be especially useful when responding to RFIs, evaluating substitutions, or reviewing unexpected site conditions.
The BOD can also support commissioning.
Commissioning asks whether the completed system performs as intended.
To answer that question effectively, the commissioning team needs to understand what the system was intended to do in the first place.
The BOD helps provide that connection between project requirements, design decisions, and final system performance.
A Simple Basis of Design Checklist
Before considering a BOD sufficiently developed for the current project stage, ask:
- Are the project objectives clearly understood?
- Are major design inputs documented?
- Are important assumptions clearly identified?
- Are applicable codes and standards listed?
- Are design criteria quantified where appropriate?
- Are information sources traceable?
- Are system concepts explained?
- Are major equipment requirements defined?
- Are discipline interfaces identified?
- Are operating and maintenance requirements considered?
- Are project constraints documented?
- Are outstanding decisions visible?
- Are future expansion requirements identified?
- Is the document consistent with the latest engineering design?
- Is there a clear revision history?
If several of these questions cannot be answered, the project may be progressing with an incomplete technical basis.
Key Takeaways
- A Basis of Design documents how project requirements are translated into engineering decisions.
- A BOD includes more than design criteria. It also records assumptions, system concepts, constraints, interfaces, and technical reasoning.
- Important assumptions should be identified explicitly rather than presented as confirmed information.
- The BOD should evolve as the project moves from feasibility and FEED into detailed design.
- Multi-discipline coordination is one of the most important functions of a strong BOD.
- Brownfield projects require particularly careful documentation of existing conditions and unverified information.
- A well-maintained BOD supports design reviews, construction decisions, commissioning, and future facility modifications.
- The document should explain not only what was selected, but also why.
Conclusion
Engineering projects produce many types of technical documents, but each serves a different purpose.
Drawings show what is being designed or constructed.
Calculations demonstrate whether the proposed design satisfies defined engineering requirements.
Specifications establish the technical requirements for materials, equipment, fabrication, installation, and performance.
The Basis of Design provides another layer of information.
It explains:
Why was the project designed this way, and what assumptions, criteria, requirements, and engineering decisions support the design?
That context becomes increasingly valuable as projects move from Feasibility Studies through FEED, Detailed Design, procurement, construction, commissioning, and eventually future modifications.
A strong Basis of Design does not eliminate change or uncertainty.
It makes the technical foundation of the project visible, traceable, and easier to manage.
Frequently Asked Questions
What does BOD mean in engineering?
BOD stands for Basis of Design. It is a technical document that records the assumptions, design criteria, system concepts, technical requirements, and key engineering decisions used as the foundation for developing a project.
What is included in a Basis of Design?
A BOD may include project objectives, scope boundaries, codes and standards, design criteria, site conditions, operating requirements, assumptions, major equipment requirements, system concepts, discipline interfaces, project constraints, outstanding information, and references.
The exact contents depend on the project and stage of engineering.
Who prepares the Basis of Design?
The BOD is typically prepared by the engineering or design team with input from the owner, operations personnel, project managers, vendors, and other project stakeholders as required.
On multidisciplinary projects, several engineering disciplines may contribute to the document.
What is the difference between a Basis of Design and design criteria?
Design criteria are the specific technical parameters used in engineering, such as design loads, temperatures, pressures, capacities, or design life.
The Basis of Design is broader. It includes design criteria as well as assumptions, system philosophy, owner requirements, design concepts, constraints, interfaces, and the reasoning behind important engineering decisions.
What is the difference between BOD and Owner’s Project Requirements?
Owner’s Project Requirements describe what the owner expects the project or facility to achieve.
The Basis of Design describes how the engineering approach is intended to satisfy those requirements.
In simple terms, the owner’s requirements define the desired outcome, while the BOD documents the technical response.
When should a Basis of Design be prepared?
Development should begin early enough to guide engineering decisions.
The BOD may start during feasibility or conceptual engineering and typically becomes more detailed during FEED. It should remain aligned with major decisions as the project progresses through detailed design.
Does the Basis of Design need to be updated?
Yes, when significant changes affect the fundamental design basis.
Changes to capacity, equipment, design criteria, operating requirements, system philosophy, or major assumptions may require the BOD to be reviewed and updated.
Is a Basis of Design required for every engineering project?
The level of documentation depends on project size and complexity.
A small engineering modification may require a relatively simple design basis, while a large multidisciplinary project may require a detailed controlled BOD covering multiple engineering disciplines and systems.
Regardless of format, important design assumptions and criteria should be documented somewhere reliable.
How does a Basis of Design relate to FEED?
Front-End Engineering Design (FEED) develops the selected project concept and establishes many of the technical criteria, system requirements, equipment assumptions, and interfaces needed before detailed engineering.
The BOD captures and organizes much of the technical basis developed during this stage so it can be carried forward consistently into detailed design.
What is the difference between a Basis of Design and a technical specification?
A Basis of Design explains the criteria, assumptions, and reasoning behind the engineering approach.
A technical specification defines requirements that equipment, materials, fabrication, installation, or completed work must satisfy.
The BOD explains the design basis, while the specification communicates requirements for implementation.